Installing an EV charger at your Austin home requires proper electrical permits. This guide walks you through the entire Austin permit process, from application to final inspection.

Quick Answer: Most residential EV charger installations in Austin require an electrical permit from the City of Austin Development Services Department. The process typically takes 1-3 weeks and costs $50-150 depending on your project scope.

Table of Contents

Do You Need a Permit?

In Austin, yes, you need an electrical permit for EV charger installation in almost all cases.

When Permits Are Required

You'll need a permit if you're:

  • Installing a dedicated 240V circuit for a Level 2 EV charger
  • Upgrading your electrical panel to accommodate EV charging
  • Running new wiring from your panel to your garage or carport
  • Installing a wall-mounted or hardwired EV charger
  • Adding a NEMA 14-50 outlet specifically for EV charging

When Permits Might Not Be Required

The only scenario where you might not need a permit:

  • Using an existing 240V outlet (like for a dryer) temporarily with a portable Level 2 charger
  • Simple plug-in to existing outlet (no new electrical work)

Important: Even if you're using existing wiring, it's smart to have a licensed electrician verify the circuit can safely handle continuous EV charging loads. Most dryer circuits aren't rated for continuous 30-40 amp draws.

Austin Permit Requirements

Austin follows the 2023 National Electrical Code (NEC) with local amendments. Here's what the city requires for residential EV charger permits:

Electrical Code Requirements

  1. Circuit Rating:

    • Minimum 40-amp dedicated circuit for most Level 2 chargers
    • 50-60 amp circuits for high-powered chargers (Tesla Wall Connector, etc.)
  2. GFCI Protection:

    • Ground Fault Circuit Interrupter required for all EV charging equipment
    • Can be in the charger itself or at the circuit breaker
  3. Dedicated Circuit:

    • EV charger must be on its own circuit
    • Cannot share with other appliances or outlets
  4. Proper Grounding:

    • Equipment grounding conductor required
    • Follows NEC Article 625 for EV power equipment
  5. Overcurrent Protection:

    • Circuit breaker sized appropriately for wire gauge and charger load
    • Typically 40-50 amp breaker for residential installations

Austin-Specific Requirements

  • Licensed Electrician: Work must be performed by a Texas-licensed electrician
  • Energy Code Compliance: Must meet Austin Energy Green Building requirements where applicable
  • HOA Approval: If in an HOA, get written approval before applying for permits (city may request documentation)

Step-by-Step Application Process

Here's exactly how to get your EV charger permit in Austin:

Step 1: Hire a Licensed Electrician (Recommended)

Timeline: 1-3 days to get quotes

While you can apply for permits yourself if you're a homeowner doing DIY electrical work, we strongly recommend hiring a licensed electrician. Here's why:

  • Licensed electricians in Austin typically pull permits as part of their service
  • They know local code requirements and inspection standards
  • They handle all paperwork and scheduling
  • Inspection pass rates are much higher with professional installations
  • Your insurance may require licensed work for liability coverage

Cost savings from DIY permits are minimal compared to the risk of failed inspections or code violations.

Step 2: Gather Required Information

Timeline: Same day

Before applying, collect:

  • Property address and parcel number (from TCAD website)
  • Homeowner contact information
  • Electrician license number (if hiring one)
  • EV charger specifications (amperage, voltage, manufacturer)
  • Current electrical panel details (amps, available space)
  • Property survey or site plan (for outdoor installations)

Step 3: Submit Permit Application

Timeline: 15-30 minutes online, or in-person visit

You have two options for applying:

Option A: Online Application (Recommended)

  1. Go to Austin Build + Connect portal
  2. Create an account or log in
  3. Select "Residential" → "Electrical Permit"
  4. Fill out permit application:
    • Property details
    • Scope of work description
    • Contractor information
    • Load calculations
  5. Upload required documents
  6. Pay permit fee online
  7. Submit application

Pro Tip: Applications submitted before 2 PM usually get reviewed same-day or next business day.

Option B: In-Person Application

Visit the Residential Plan Review Center:

  • Location: 6310 Wilhelmina Delco Drive, Austin, TX 78752
  • Hours: Monday-Friday, 8:00 AM - 4:00 PM
  • Bring all documents in paper form
  • Pay with check, cash, or card
  • Get permit number same-day for simple installations

Step 4: Permit Review

Timeline: 1-5 business days

City of Austin reviewers will check your application for:

  • Code compliance
  • Completeness of documentation
  • Load calculations accuracy
  • Proper equipment specifications

Fast-Track Option: Simple residential EV charger permits often qualify for express review (approved within 24-48 hours) if all documentation is complete and meets code.

Step 5: Receive Permit Approval

Timeline: Same day as approval

Once approved, you'll receive:

  • Permit number
  • Approved plan set (stamped)
  • Inspection requirements
  • Permit placard (to post at installation site)

Important: Keep your permit number handy. You'll need it to schedule inspections.

Step 6: Schedule Rough-In Inspection (If Applicable)

Timeline: 1-3 days wait for inspector

If your installation involves running new wiring through walls or underground:

  1. Call Austin Development Services: (512) 978-4000
  2. Request "electrical rough-in inspection"
  3. Provide permit number and preferred date
  4. Inspector will verify wiring before it's covered up

Not all EV charger installations need rough-in inspections. If your electrician is running surface conduit in a garage, you may only need a final inspection.

Step 7: Complete Installation

Timeline: 4-8 hours for most installations

Your electrician will:

  • Install circuit breaker in panel
  • Run wiring to charger location
  • Mount EV charger
  • Make all electrical connections
  • Test system operation
  • Ensure all code requirements are met

Do not use the charger before final inspection and approval.

Step 8: Schedule Final Inspection

Timeline: 1-5 days wait for inspector

Once installation is complete:

  1. Call (512) 978-4000 or schedule online via Austin Build + Connect
  2. Request "electrical final inspection"
  3. Provide permit number
  4. Choose inspection date (usually 1-3 day lead time)

Inspection Tips:

  • Be present or have your electrician there to answer questions
  • Make sure permit placard is visible at work site
  • Have charger accessible (not blocked by vehicles)
  • Keep approved plans on-site for inspector reference

Step 9: Pass Final Inspection

Timeline: 30-60 minutes for inspector visit

The inspector will verify:

  • Circuit breaker properly sized and installed
  • Wiring meets code (gauge, type, routing)
  • GFCI protection present and functional
  • Charger properly mounted and grounded
  • No violations of NEC or local code
  • Work matches approved permit plans

If you pass:

  • Inspector signs off on permit
  • You receive approval documentation
  • You can legally use your EV charger
  • Permit closes automatically

If corrections are needed:

  • Inspector provides written list of items to fix
  • You make corrections
  • Schedule re-inspection
  • No additional permit fee for re-inspections

Required Documentation

Here's exactly what you need to include with your Austin EV charger permit application:

Mandatory Documents

1. Site Plan or Survey

  • Shows property boundaries
  • Indicates charger installation location
  • Distance from property lines
  • Can be a hand-drawn sketch for most residential installations

2. Load Calculation

  • Electrical panel capacity (total amps)
  • Current loads on panel
  • New EV charger load
  • Calculation showing panel can handle additional load
  • Template available on Austin Development Services website

3. Charger Specifications

  • Manufacturer name and model number
  • Input voltage and amperage requirements
  • UL listing or certification
  • Installation manual (can be submitted as PDF)

4. Circuit Diagram

  • Shows new circuit from panel to charger
  • Wire gauge and type
  • Circuit breaker size
  • GFCI location
  • Grounding details

5. Contractor Information (if using one)

  • Texas electrical contractor license number
  • Company name and contact info
  • Contractor signature on application

Optional But Helpful Documents

HOA Approval Letter

  • Written approval from homeowners association
  • Not required by city but can prevent delays
  • Inspectors may ask for it if property is in HOA

Photos of Existing Panel

  • Shows available breaker space
  • Helps reviewers assess upgrade needs
  • Can speed up approval process

Manufacturer's Installation Guide

  • Demonstrates proper installation methods
  • Helpful for less common charger models

Inspection Timeline

Here's what to expect for inspection scheduling and timing in Austin:

Typical Timeline

| Phase | Timeline | |-------|----------| | Permit application submission | Day 0 | | Permit review and approval | 1-5 business days | | Installation work | 1-2 days after approval | | Rough-in inspection scheduling | 1-3 days wait | | Rough-in inspection (if needed) | 30 min visit | | Complete installation | Same day or next day | | Final inspection scheduling | 1-5 days wait | | Final inspection | 30-60 min visit | | Total timeline | 1-3 weeks from start to finish |

Best Practices for Faster Inspections

1. Apply on Monday-Wednesday

  • Permits submitted early in week get reviewed faster
  • Avoid Friday submissions (may not be reviewed until Monday)

2. Schedule Morning Inspections

  • Inspectors start routes early
  • Morning slots less likely to be delayed
  • 8-10 AM time slots are most reliable

3. Be Flexible on Dates

  • Offering multiple available dates gets you scheduled sooner
  • Inspectors can fill cancellations if you're flexible

4. Use Online Scheduling

  • Austin Build + Connect portal often has more availability than phone
  • Can see exact time slots available
  • Automatic confirmation and reminders

Peak Permit Seasons

Inspection wait times can be longer during:

  • Spring (March-May): Peak home improvement season
  • Fall (September-October): Pre-winter rush
  • End of year: Tax credit deadline rushes

Off-peak months (January-February, June-August) typically have fastest turnaround.

Permit Costs

Here's what you'll pay for EV charger permits in Austin:

City Permit Fees

Base Electrical Permit: $50-150

  • Depends on scope of work
  • Simple 240V circuit installation: ~$75
  • Panel upgrade + circuit installation: $100-150
  • Trade discount may apply if electrician pulls permit

Inspection Fees: Included in permit fee

  • No separate charge for first inspection
  • Re-inspections are free (no limit)

Plan Review Fee: Usually waived for simple residential EV charger installs

  • Complex installations may have $50-100 review fee

Total Cost Breakdown

DIY Permit Application:

  • City permit fee: $75
  • Your time: 2-3 hours
  • Total: $75 + your time

Electrician-Pulled Permit (Typical):

  • Permit fee: $75-150 (usually included in installation quote)
  • Electrician handles all paperwork and scheduling
  • Total: Included in installation cost ($1,200-2,500)

Most homeowners choose the electrician option because:

  • Saves time and hassle
  • Higher inspection pass rates
  • Professional knows local code
  • Included in total installation cost anyway

When Panel Upgrades Are Required

If your electrical panel needs upgrading (from 100A to 200A service), additional fees apply:

  • Panel upgrade permit: $100-200
  • Utility coordination fee: $0-500 (Austin Energy)
  • Total permit cost: $175-350

Panel upgrades add $1,500-3,500 to total project cost, but are often necessary for homes with older electrical systems.

Common Mistakes to Avoid

Learn from others' permit mistakes to save time and money:

Mistake #1: Starting Work Before Permit Approval

Problem: Installing charger before permit is issued Consequence:

  • Inspector can require removal and reinstallation
  • Potential fines ($500-1,000)
  • Work must be exposed for inspection even if complete

Solution: Wait for permit approval before starting any electrical work.

Mistake #2: Incomplete Load Calculations

Problem: Not showing panel has capacity for EV charger load Consequence:

  • Permit application rejected
  • Delays of 3-7 days to resubmit
  • May require expensive panel upgrade

Solution: Have electrician perform proper load calculation before applying. If panel is close to capacity, plan for upgrade from the start.

Mistake #3: Wrong Wire Gauge

Problem: Using 10 AWG wire for 50-amp circuit (should be 6 AWG) Consequence:

  • Inspection failure
  • Rewiring required ($300-800)
  • Re-inspection needed

Solution: Follow NEC Table 310.16 for conductor sizing. When in doubt, go one size larger than minimum.

Mistake #4: Missing GFCI Protection

Problem: Installing charger without required ground fault protection Consequence:

  • Failed inspection
  • GFCI breaker purchase and installation ($150-250)
  • Safety hazard

Solution: Use GFCI circuit breaker or verify charger has built-in GFCI. Check manufacturer specs.

Mistake #5: Forgetting HOA Approval

Problem: Getting permit before HOA approval Consequence:

  • HOA may deny after permit issued
  • Wasted permit fee
  • Delayed installation

Solution: Get HOA architectural approval before applying for city permit. Some HOAs take 30-60 days to approve.

Mistake #6: Not Posting Permit Placard

Problem: Permit not visible at job site during inspection Consequence:

  • Inspector may not perform inspection
  • Rescheduling required (adds 1-5 days)

Solution: Post permit placard in window or on garage door where inspector can easily see it.

Mistake #7: Installing in Wrong Location

Problem: Charger installed somewhere other than permitted location Consequence:

  • Inspection failure
  • May require permit amendment
  • Possible relocation ($400-1,200)

Solution: Stick to the location shown on approved plans. If you need to change location, request permit amendment before installation.

Working with Licensed Electricians

Hiring the right electrician makes the permit process smooth. Here's what to look for:

Qualifications to Verify

1. Texas Electrical Contractor License

2. Austin Experience

  • Familiarity with local code amendments
  • Established relationship with Austin inspectors
  • Knowledge of Austin Energy requirements

3. EV Charger Specialization

  • Experience with your specific charger model
  • Understanding of NEC Article 625
  • Portfolio of completed EV installations

Questions to Ask Your Electrician

About Permits:

  • "Do you pull permits as part of your service?"
  • "What's your typical permit approval timeline?"
  • "How many EV charger permits have you done in Austin?"
  • "What's your inspection pass rate?"

About Installation:

  • "Does my panel need upgrading?"
  • "What wire gauge will you use?"
  • "Where will the GFCI protection be?"
  • "How long until I can use the charger after installation?"

About Costs:

  • "Is the permit fee included in your quote?"
  • "What happens if we fail inspection?"
  • "Are there any potential additional costs I should know about?"

What Should Be Included in Quote

A comprehensive electrician quote should include:

  • ✅ Permit application and fees
  • ✅ All materials (wire, conduit, breaker, etc.)
  • ✅ Labor for installation
  • ✅ Inspection scheduling and attendance
  • ✅ Any necessary panel modifications
  • ✅ Warranty on workmanship (typically 1 year)

Red flags:

  • ❌ "We don't need a permit for this"
  • ❌ Permit fee charged separately without explanation
  • ❌ No mention of inspections in quote
  • ❌ Unwilling to provide license number

Permit Responsibility

Who pulls the permit matters:

Electrician Pulls Permit (Recommended):

  • They handle all paperwork
  • They schedule inspections
  • They're present for inspections
  • They're responsible for code compliance
  • Your responsibility: Pay their invoice

Homeowner Pulls Permit (DIY):

  • You handle all applications
  • You schedule inspections
  • You must be present for inspections
  • You're responsible for code compliance
  • Electrician's responsibility: Perform work to code

Bottom line: Unless you're very confident in electrical work and permitting processes, let your electrician handle permits. The small additional cost ($0-100) is worth the peace of mind.

Austin-Specific Permit Resources

Online Resources

Austin Build + Connect Portal

  • Website: abc.austintexas.gov
  • Online permit applications
  • Inspection scheduling
  • Permit status tracking
  • Document upload

City of Austin Development Services

Austin Energy

  • Website: austinenergy.com
  • EV charging guidelines
  • Rebate information
  • Load management programs
  • TOU rate schedules

Phone Contacts

Development Services Customer Service:

  • Phone: (512) 978-4000
  • Hours: Monday-Friday, 8 AM - 5 PM
  • For: Permit questions, application help, inspection scheduling

Austin Energy EV Support:

  • Phone: (512) 494-9400
  • Hours: Monday-Friday, 7 AM - 7 PM
  • For: Utility requirements, meter upgrades, rebates

Electrical Contractor Licensing:

  • Phone: (512) 463-6599 (TDLR)
  • For: Verify contractor licenses, file complaints

In-Person Help

Residential Plan Review Center:

  • Address: 6310 Wilhelmina Delco Drive, Austin, TX 78752
  • Hours: Monday-Friday, 8 AM - 4 PM
  • Services: Permit applications, plan review, permit questions
  • Parking: Free parking available

Best time to visit: Tuesday-Thursday mornings (8-10 AM) for shortest wait times.

FAQs

How long does it take to get an EV charger permit in Austin?

Typical timeline is 1-3 weeks from application to final inspection approval. Simple installations with complete applications can be approved in 24-48 hours.

Can I install my own EV charger without a permit?

No. Almost all EV charger installations require an electrical permit in Austin. The only exception is using an existing outlet with no modifications.

How much does an Austin EV charger permit cost?

Base electrical permit fees range from $50-150 depending on scope. Most simple EV charger installations cost around $75 for the permit.

Do I need HOA approval before getting a permit?

The city doesn't require HOA approval to issue a permit, but your HOA may have rules requiring their approval before installation. Get HOA approval first to avoid conflicts.

What happens if I fail the inspection?

The inspector will provide a written list of corrections needed. You fix the issues and schedule a free re-inspection. There's no limit on re-inspections.

Can I use the charger while waiting for final inspection?

No. You should not use the EV charger until after final inspection approval. Using unpermitted electrical work can void warranties and insurance coverage.

Does my electrician need to be licensed in Texas?

Yes. All electrical work requiring permits in Austin must be performed by a Texas-licensed electrical contractor. Verify license at TDLR.texas.gov.

What if my electrical panel doesn't have space for a new breaker?

You may need a panel upgrade or a subpanel installation. Both require separate permits and add $1,500-3,500 to project cost.

Can I get a permit same-day?

For simple in-person applications at the Residential Plan Review Center, you can sometimes get permit approval same-day. Online applications typically take 1-5 business days.

Do I need a separate permit for running conduit in my garage?

No. The electrical permit covers the entire installation including conduit, wiring, breaker, and charger mounting.

Next Steps

Ready to get your EV charger permitted and installed in Austin?

Your Permit Checklist

  • [ ] Decide: DIY permit or electrician-pulled permit?
  • [ ] Get HOA approval (if applicable)
  • [ ] Gather property information and panel details
  • [ ] Collect EV charger specifications
  • [ ] Prepare load calculation
  • [ ] Submit permit application
  • [ ] Wait for permit approval (1-5 days)
  • [ ] Schedule installation
  • [ ] Complete installation work
  • [ ] Schedule final inspection
  • [ ] Pass inspection and close permit
  • [ ] Start charging your EV!

Get Professional Help

While permits might seem straightforward, most Austin homeowners find it easier to work with a licensed electrician who handles the entire process.

Benefits of professional installation:

  • ✅ Permits pulled and managed for you
  • ✅ Code-compliant installation guaranteed
  • ✅ Higher first-time inspection pass rates
  • ✅ Warranty coverage on workmanship
  • ✅ Liability insurance protection
  • ✅ Faster project completion

Ready to get started? Get a free quote from Austin EV charger installers →


Related Articles


Need help with your EV charger permit and installation in Austin? Our network of licensed electricians handles everything from permit applications to final inspections. Get a free quote today and have your charger installed in as little as 2 weeks.

Get Free Quote →

Ready to Install Your EV Charger?

Get a free quote from top-rated EV charger installers in Austin.

Get Free Quote